Steam turbine generator units 1 and 2 are critical machines in Mong Duong 2 TPP, Vietnam. Each unit contributes 620MW. Both STGs are monitored monthly as part of a periodic SSA contract. If either unit trips, it will result in a costly startup and affects the entire plant's reliability.